Manage linked items from the workspace item panel
Use the linked items panel to review related tasks, forms and reports, and navigate directly to the correct workspace views.
This guide is designed for project manager.
Steps
Step 1: Open the linked items panel for a workspace item
From the workspace item view, locate the linked items panel showing sections for related tasks, forms, reports and permits, along with a count of items in each group.

Step 2: Review resolved labels and item counts
Check that each section lists linked items with clear labels instead of internal IDs, and verify the count for each group to understand how many related records exist.

Step 3: Navigate to a linked item
Select a linked item entry to open its detailed view in the appropriate workspace route, using the browser navigation to return if required.

Step 4: Open the target list view for a group
Click a group header or configured link within the panel to move to the full list or board view for that category, filtered to the relevant project where applicable.

Step 5: Add a new linked item when a group is empty
When a section has no linked items, use the inline link or add action provided in the panel to create or attach a new related item directly from this workspace item.

Step 6: Distinguish between required and issued permits
In the permits section, review the separate indicators for permits required versus permits issued so you can clearly see which permits are still outstanding.

Last updated: 2026-07-31