Manage the list of minor works that don't need a full permit

Decide which low-risk, minor temporary works can go ahead without a full design and permit, so routine jobs aren't held up for no reason.

Audience

This guide is designed for construction professional.

Steps

Step 1: Open the minor works list

From the Temporary Works section, open the Minor Works Allowlist. The current list of exempt item types loads automatically.

Step 2: Check what's on the list

Look through each item type to see which minor temporary works are currently allowed to skip the full design and permit process.

Step 3: Add or change an item

Add a new type of minor works to the list, or change an existing one, if you have permission to set temporary works policy for the project.

Step 4: Remove an item

Remove a type from the list so it goes back to needing the full temporary works process.