Skip to main content

Review component details, lifecycle and linked documents

Use the Component Details tabs to review key information, lifecycle status, ITP checklist and linked documents for a specific project component.

Audience

This guide is designed for project manager.

Steps

Step 1: Open the component detail view

From your project workspace, select the relevant component to open its detail view, where the tabbed interface for that item is displayed.

Open the component detail view

Step 2: Review the Overview tab

Use the default overview tab to see the component’s core metadata, including title, reference, package information, tags and current lifecycle state.

Review the Overview tab

Step 3: Check lifecycle status and key dates

In the lifecycle section, review formatted metadata such as status, important milestones and dates to understand where the component sits in the project process.

Check lifecycle status and key dates

Use the member and package details shown on the tabs to confirm who is responsible for the component and how it relates to its parent package.

View responsible people and related packages

Step 5: Open the ITP record for the component

Select the ITP-related tab or action to open the dedicated ITP record for the component; the system resolves and loads the single source-of-truth ITP workspace item.

Open the ITP record for the component

Step 6: Work through the ITP checklist

In the ITP checklist view, review and update inspection and test points to ensure the component meets project quality and compliance requirements.

Work through the ITP checklist

Step 7: Review linked documents

Open the Documents tab to see all documents currently linked to the component, such as drawings, specifications and certificates, using the linked documents section.

Review linked documents

Step 8: Navigate to a linked document

Select a document from the list to navigate directly to its detailed view in a new or existing document page, using the document navigation action.

Navigate to a linked document

Step 9: Refresh and confirm linked documents

Return to the component tabs to confirm that the displayed list of linked documents reflects the latest saved state from the workspace item.

Refresh and confirm linked documents


Last updated: 2026-07-15