Manage subcontractor handover uploads

Use the subcontractor upload page to request, track and receive required handover documents from subcontractors.

Audience

This guide is designed for project manager.

Steps

Open the shared handover link sent to the subcontractor to view the branded upload page showing all required items and current progress.

Open the subcontractor handover upload link

Step 2: Review required handover items and their status

Scroll through the page to see each required item grouped under section headings, with coloured status cards showing whether evidence is missing, submitted, accepted or needs resubmission.

Review required handover items and their status

Step 3: Enter subcontractor contact details

Ensure the subcontractor enters their name and email address in the contact details fields so that the submission can be verified and tracked.

Enter subcontractor contact details

Step 4: Upload evidence files for each required item

For each required item, the subcontractor drags and drops files or uses the file picker to attach documents, drawings or certificates to the correct item card.

Upload evidence files for each required item

Step 5: Respond to resubmission requests

Where an item shows as needing resubmission, the subcontractor reviews the inline reviewer notes and replaces the file with an updated version before continuing.

Respond to resubmission requests

Step 6: Check overall submission progress

Use the progress bar at the top of the page to see how many required items have evidence attached and the overall completion percentage for the handover package.

Check overall submission progress

Step 7: Save and exit the current upload session

When the subcontractor is ready, they select Save and exit to submit all files uploaded in this session so you can review them, with the option to return later if more evidence is needed.

Save and exit the current upload session

Step 8: Complete the handover submission

Once at least one successful submission exists and all requested items are satisfied, the subcontractor can use the finish option (where enabled) to confirm that their handover evidence is complete.

Complete the handover submission


Last updated: 2026-07-13