Manage daily check schedules for a plant
Configure and maintain the daily form schedule for a plant so operators stay authorised and the plant board status turns green.
This guide is designed for project manager.
Steps
Step 1: Open the plant workspace item
In the workspace, open the plant item you want to manage so that the plant details and QR sticker panel are visible.

Step 2: Locate the daily check schedule panel
Scroll below the plant QR sticker to find the daily check schedule panel, which shows the current schedule status and any warnings.

Step 3: Start creating or editing the schedule
Select the option to create a new schedule or edit the existing one to open the schedule editor form for this plant.

Step 4: Choose the daily check form template
In the editor, pick the correct form template that operators must complete for this plant’s daily checks.

Step 5: Set schedule frequency and timing
Configure how often the form should be issued, including the frequency, time of day, timezone, and any specific days of the week.

Step 6: Review status and pause settings
Check whether the schedule is enabled or paused, add any pause reason if required, and confirm that the status and next issue time look correct.

Step 7: Save and apply the schedule
Submit the form to save your changes so the operator-facing flow recognises the schedule and the plant board can move from red to green once checks are completed.

Step 8: Confirm last and next checks
After saving, review the summary to see the last submission time, next issue time, and any status messages shown for this plant’s daily check schedule.

Last updated: 2026-09-01