Add a new plant check using the wizard
Use the Add Check wizard to set up routine or statutory checks for a specific plant item.
This guide is designed for project manager.
Steps
Step 1: Open the Add Check wizard
In the plant admin area, open the Add Check wizard for the required plant item to start creating a new check.

Step 2: Confirm the check type
Review the preselected check type (for example, a daily pre-use check or a LOLER thorough examination) and click Next to continue.

Step 3: Set the check cadence
Choose how often the check should take place, then click Next to move on to responsibility settings.

Step 4: Assign responsibility for the check
Specify who is responsible for carrying out the check, then click Next to proceed to the confirmation screen.

Step 5: Enter certificate expiry details for LOLER checks
When creating a LOLER (Tier-2) check, enter the current certificate expiry date into the date field before continuing.

Step 6: Review and add the check
Confirm the plant details, check type, cadence, responsibility, and any certificate expiry information, then click Add check to save and close the wizard.