Edit geometry overlays on a drawing
Use the geometry overlay editor to review and adjust polygons, polylines and counted points on an uploaded drawing.
This guide is designed for project manager.
Steps
Step 1: Open the drawing with geometry overlays
Navigate to the drawing that has material schedule geometry attached and open it so the image and overlay editor are displayed together.

Step 2: Show or hide geometry overlays
Use the geometry visibility toggle to show the polygons, polylines and counted points over the drawing, or hide them to view the image alone.

Step 3: Review polygons, polylines and points
Inspect each polygon outline, line measurement and counted point rendered in the normalised image space to confirm they align with the drawing.

Step 4: Select a geometry vertex for editing
Click on a polygon or polyline vertex to make it active so you can adjust its position without changing the underlying geometry type.

Step 5: Nudge a vertex using the keyboard
With a vertex selected, use the keyboard arrow keys to nudge it; the editor automatically clamps movements so the point stays within the drawing area.

Step 6: Add a new point to refine the shape
Use the add-point control near a selected edge to insert a midpoint, increasing the number of vertices so you can refine the polygon or polyline shape.

Step 7: Remove an unnecessary point
Select a redundant vertex and use the remove-point control to simplify the shape while the editor enforces the minimum number of points required.

Step 8: Confirm updated geometry for schedule items
After editing, review the adjusted shapes and points, then save your changes so the linked material schedule items use the updated geometry.

Related Guides
Last updated: 2026-08-04