View and manage task details in the side panel
Use the task detail side panel to review task information, update its status and priority, and collaborate through comments.
This guide is designed for project manager.
Steps
Step 1: Open the task detail panel
Select a task in the calendar or task list to open its detail panel, which slides in from the side and shows an overview of the task.

Step 2: Review key task information
Review the task title, description, priority, status, due date, time, assignee, tags and any related document links at the top of the panel.

Step 3: Adjust panel size or close the view
Use the maximise or minimise icons to expand or shrink the panel width, or select the close icon to hide the panel when you are finished.

Step 4: Update the task status
Change the task status using the status chip or control provided, such as moving the task to in progress, blocked or completed, so that progress is reflected for the rest of the team.

Step 5: Change task priority
Update the task priority to low, medium or high using the priority control so that the task is clearly flagged with the correct importance level.

Step 6: View task history
Switch to the history view to see a chronological list of updates and status changes for the task, including when and by whom they were made.

Step 7: Share the task with others
Use the share action to generate a shareable link or send the task to collaborators so they can review or update it.

Step 8: Open related documents
Select the related document link or file icon to open any associated specification, brief or attachment connected to the task.

Step 9: Add a new comment
Open the comments view, type your message into the comment box, and select the send icon to post a new comment on the task.

Step 10: Reply to and manage existing comments
Review existing comments in the comments view, reply where needed and, if you have permission, delete comments that are no longer relevant.

Step 11: Save your changes
Confirm or save any edits to the task details so that status, priority and comments are synchronised with the main task view.

Related Guides
Last updated: 2026-08-31