Review and manage the ITP register
Use the ITP register to review all ITPs on the project, monitor progress, and drill into individual ITP details.
This guide is designed for project manager.
Steps
Step 1: Open the ITP register from the workspace sidebar
In your project workspace, select the ITPs item in the left-hand sidebar to open the project-wide ITP register page.

Step 2: Review the ITP summary header
At the top of the page, review the summary counts showing total ITPs, those in progress, any open hold points, and completed ITPs to understand overall status at a glance.

Step 3: Filter the register by status, hold points, due window, package and discipline
Use the filter chips and controls above the list to narrow the register by ITP status, presence of hold points, due date windows, specific packages, and disciplines, so you see only the ITPs relevant to your current review.

Step 4: Search for ITPs by reference, title or component
Use the search box to type an ITP reference, title, or component name; the list updates as you type to show matching ITPs only.

Step 5: Open an ITP’s detailed workspace item view
Click any ITP row in the register to open its workspace-item detail view, where you can review the full ITP content and related information.

Step 6: Access ITP templates from the Templates tab
Switch to the Templates tab at the top of the page to access and manage ITP templates, keeping them close to the live register for quick configuration work.

Step 7: Use guided setup when the register is empty
When the register has no ITPs, follow the guided options shown (such as the composite ITP set-up pipeline or assigning templates to existing packages) to quickly prepare the project for ITP use.

Last updated: 2026-09-01