View temporary works details by tab
Use the tabbed temporary works detail view to quickly switch between general information, permits or sign-off, inspections and authorisations.
This guide is designed for project manager.
Steps
Step 1: Open the temporary works detail view
Navigate to the relevant temporary works item in your project and open its detail page to see the tabbed layout across the top.

Step 2: Review the General information
Select the "General" tab to review the main summary, status and core details of the temporary works item.

Step 3: Manage permits or sign-off for minor works
For standard profiles, select the "TW permits" tab to review permits linked to the item; for minor-profile works, use the "Sign-off" tab to record or close sign-offs and escalate to the TWC when required.

Step 4: Check inspections
Open the "Inspections" tab to view inspection records associated with the temporary works item and confirm that inspections are up to date.

Step 5: Review authorisations
Select the "Authorisations" tab to see who has authorised the temporary works activity and verify that the correct approvals are in place.

Related Guides
Last updated: 2026-07-27