Temporary Works Assessment
Category: Quality
Not sure what temporary works your project requires? This task analyses the programme and supporting documents to identify all temporary works — producing a comprehensive schedule referencing UK guidance (BS 5975:2019, CIRIA, TWf, HSE) and creating BS 5975-compliant register entries for each identified item.
Input Parameters
| Parameter | Type | Required | Description |
|---|---|---|---|
| Review Context | Text | No | Optional additional information, assumptions, or specific focus areas for the assessment (e.g. pa... |
| Files to Review | Document Picker | No | Select existing project documents, or upload new files (up to 10). These should include drawings,... |
| Additional Notes | Text | No | Optional free-text notes, constraints, or clarifications that should be considered when identifyi... |
| Create Summary Report | Boolean | No | If enabled, creates a markdown report summarizing all identified temporary works and their risk a... |
| Create Temporary Works Register Entries | Boolean | No | If enabled, creates BS5975-compliant temporary works register entries for each identified item. E... |
Outputs
Summary
Type: Text/Markdown
Summary
Outputs
Type: Array
Outputs
Completion Time
Type: Text/Markdown
Completion Time
Report Id
Type: Text/Markdown
Report ID
Temporary Works Count
Type: Number
Temporary Works Count
Tw Created Count
Type: Number
TW Records Created
Tw Skipped Count
Type: Number
TW Records Skipped
Created Tw Records
Type: Array
Created TW Records
Example Use Cases
TW Assessment from Drawings
Assess temporary works requirements from uploaded structural drawings.
Configuration:
- Create Report:
True - Create Tw Records:
True
Tags: temporary-works · tw-assessment · bs5975 · planops-report · safety
Last updated: 2026-06-24