Draft an inspection and test plan from a list of activities
Category: Quality
Turns an activities report or a work package into a full ITP with inspection stages, who signs each one and how it is checked.
Input Parameters
| Parameter | Type | Required | Description |
|---|---|---|---|
| Source Type | Dropdown | Yes | Choose how to provide the activities: select an existing document or report, or pick a work packa... |
| Activities Document / Report | Document Picker | No | Select the Trade Activities report (or any project document) to generate an ITP from. You can als... |
| Work package | Dropdown | No | Select a work package on the project. The ITP is built from the package scope and the components ... |
| Trade / Package Name | Text | No | Name of the trade or package. Optional — if left blank when a work package is selected, the packa... |
| Project Information | Text | No | Additional project information to inform the ITP (e.g. project type, key constraints, programme c... |
| Specific Inspection Requirements | Text | No | Any specific inspection requirements, hold points mandated by client/authority, or testing freque... |
| Responsible Parties Configuration | Text | No | Define the parties involved and any specific responsibility preferences (e.g. subcontractor name,... |
| Additional Context / Instructions | Text | No | Any other context, constraints, or specific instructions for generating the ITP. |
| Additional Uploads | File Upload | No | Upload any additional documents (specifications, employer's requirements, method statements) to i... |
Parameter Details
Source Type
Choose how to provide the activities: select an existing document or report, or pick a work package and use its components.
Options:
document- Document / Reportpackage- Work package
Default: document
Outputs
Summary
Type: Text/Markdown
Task Summary
Outputs
Type: Structured Data (JSON)
Outputs
Report Id
Type: Text/Markdown
Report ID
Itp Json
Type: Structured Data (JSON)
ITP JSON
Completion Time
Type: Text/Markdown
Completion Time
Disclaimer
Type: Array
Disclaimer
Example Use Cases
Groundworks ITP from report
Generate an Inspection & Test Plan from a selected groundworks activities report.
Configuration:
- Source Type:
document - Trade Name:
Groundworks
ITP from a work package
Draft an inspection and test plan from a work package and the components inside it.
Configuration:
- Source Type:
package
Tags: itp · inspection-test-plan · quality-assurance · pre-appointment
Last updated: 2026-08-31