Skip to main content

Issue TW Erection Inspection

Category: Forms And Templates

Pre-populate and issue a Temporary Works Erection Inspection scoped to a specific TW package. Hydrates design reference, designer + design check status, expected loads, intended use period, and related permits from the temporary works model; seeds checklist rows from the TW design check items.

Input Parameters

ParameterTypeRequiredDescription
TW PackageDropdownYesThe Temporary Works package to inspect.
InspectorUser PickerYesThe TWC, supervisor, or designer check assigned to this inspection. Pick someone from the project...
Inspector RoleDropdownYes
Inspection DateDateYes

Parameter Details

Inspector Role

Options:

  • twc - Temporary Works Coordinator
  • tw_supervisor - Temporary Works Supervisor
  • designer_check - Designer Check
  • competent_person - Competent Person

Default: twc

Outputs

Summary

Type: Text/Markdown

Summary

Outputs

Type: Array

Outputs

Completion Time

Type: Text/Markdown

Completion Time

Form Instance Id

Type: Text/Markdown

Form Instance ID

Example Use Cases

Scaffold erection — TW-014

Issue an erection inspection for scaffold package TW-014 with the TWC.

Configuration:

  • Tw Package Id: tw_pkg_abc123
  • Inspector User Id: user_789
  • Inspector Role: twc
  • Inspection Date: 2026-05-08

Tags: audit · temporary-works · erection · permit-to-load · twc · form-instance


Last updated: 2026-06-17