Issue a handover pack for a commissioned system
Category: Forms And Templates
Fills in the subcontractor, package, open snags and NCRs. Lists the commissioning records and certificates the discipline must produce.
Input Parameters
| Parameter | Type | Required | Description |
|---|---|---|---|
| Subcontractor Representative | Dropdown | Yes | |
| Subcontractor | Organization Picker | Yes | Select the subcontractor organisation handing over the works, or create it inline if it is not ye... |
| System / Discipline | Dropdown | Yes | |
| Work Package / Subcontract Reference | Text | No | |
| Handover Date | Date | Yes | |
| Scope of Works Handed Over | Text | Yes |
Parameter Details
System / Discipline
Options:
mep_mechanical- MEP — Mechanicalmep_electrical- MEP — Electricalmep_public_health- MEP — Public Health / Plumbinghvac- HVAC / Air Conditioningbms_controls- BMS / Controlsfire_alarm_detection- Fire Alarm & Detection (BS 5839)fire_suppression_sprinkler- Sprinkler / Suppressionlifts_escalators- Lifts & Escalators (LOLER)lightning_protection- Lightning Protection (BS EN 62305)security_access_cctv- Security / Access / CCTVgas_installation- Gas Installationmedical_gases- Medical Gases (HTM 02-01)renewables_solar- Renewables — Solarrenewables_heatpump- Renewables — Heat Pumpwater_treatment_hygiene- Water Treatment / Hygienespecialist_other- Other Specialist Commissioned System
Outputs
Summary
Type: Text/Markdown
Summary
Outputs
Type: Array
Outputs
Completion Time
Type: Text/Markdown
Completion Time
Form Instance Id
Type: Text/Markdown
Form Instance ID
Expected Certs Count
Type: Number
Expected Certificates
Example Use Cases
Issue complex handover for fire alarm subcontractor
Issue a complex subcontractor handover for the fire alarm and detection package.
Configuration:
- Subcontractor Rep User Id:
user_456 - Subcontractor Name:
FireGuard Systems Ltd - System Type:
fire_alarm_detection - Work Package Ref:
WP-031 - Handover Date:
2026-06-30 - Scope Description:
Whole-building fire alarm and detection system (BS 5839-1) — Category L1
Tags: audit · handover · subcontractor · complex · commissioning · statutory · form-instance