Skip to main content

Issue a temporary works dismantling inspection

Category: Forms And Templates

Fills in the design dismantling sequence, live permits to load, residual loads and exclusion zones for the temporary works package.

Input Parameters​

ParameterTypeRequiredDescription
TW PackageDropdownYesThe Temporary Works package being dismantled.
InspectorUser PickerYesThe TWC, supervisor, or competent person assigned to this dismantling inspection. Pick someone fr...
Inspector RoleDropdownYes
Inspection DateDateYes

Parameter Details​

Inspector Role

Options:

  • twc - Temporary Works Coordinator
  • tw_supervisor - Temporary Works Supervisor
  • designer_check - Designer Check
  • competent_person - Competent Person

Default: twc

Outputs​

Summary​

Type: Text/Markdown

Summary

Outputs​

Type: Array

Outputs

Completion Time​

Type: Text/Markdown

Completion Time

Form Instance Id​

Type: Text/Markdown

Form Instance ID

Active Permits Count​

Type: Number

Active Permits-to-Load

Example Use Cases​

Scaffold dismantling — TW-014​

Issue a dismantling inspection for scaffold TW-014 once works are complete.

Configuration:

  • Tw Package Id: tw_pkg_abc123
  • Inspector User Id: user_789
  • Inspector Role: twc
  • Inspection Date: 2026-06-15

Tags: audit · temporary-works · dismantling · permit-to-dismantle · twc · form-instance


Last updated: 2026-08-31